Rental Chillers, Cooling, Generators & Portacabins
Trusted turnkey equipment solutions across Dubai, Abu Dhabi, Sharjah, and all UAE. Rental chillers, temporary cooling, wild air, rental AC, refurbished chillers, rental & used generators, and new & used portacabins with rapid dispatch.

Complete Cooling, Generator & Portacabin Solutions
Explore all 12 core services delivered by Hire Equipments across Dubai, Abu Dhabi, Sharjah, and the Northern Emirates.
Generator Fleet by kVA Output — Tailored for UAE Site Demands
Select your required electrical load below to inspect acoustic ratings, Cummins/Perkins engine specifications, internal fuel capacity, and burn rates calibrated for continuous 50°C desert operation.
500 kVA Soundproof Diesel Generator
Engine: Cummins QSX15-G8 • Built for severe 50°C UAE ambient environments.
Standard Inclusions:

Equipment Available for Rental, Purchase & Refurbished Supply
Engineered for UAE municipalities, DEWA, ADDC, SEWA, and industrial site compliance.
50 - 1500 TRRental & Refurbished Chillers
Air-cooled and water-cooled industrial chillers, buffer tanks, and chilled-water pumps built for 50°C UAE ambient cooling and emergency bypass.
Temp HVAC & ACWild Air, Temporary Cooling & Rental AC
High-CFM construction wild air dehumidification, packaged rooftop AC units, floor-standing ACs, and portable spot coolers for tents, towers, and warehouses.
New & Used CabinsNew & Used Portacabins + Generator Diesel Supply
Insulated 10x10ft, 20x10ft, and 40x10ft site offices and cabins delivered by hiab crane, paired with scheduled 10 PPM diesel supply for generators across Dubai, Abu Dhabi, and Sharjah.
Understanding ISO 8528 Standards: Prime Power (PRP) vs Emergency Standby (ESP)
Choosing the correct generator rating is essential to prevent engine overload, excessive fuel burn, and unexpected shutdown on UAE project sites.
Prime Power (PRP)
Maximum electrical power available at variable load for unlimited hours per year. Ideal for UAE construction sites, off-grid industrial camps, and continuous events.
Emergency Standby Power (ESP)
Maximum available power for utility outage backup up to 200 hours per year. Recommended for hospitals, data centers, and commercial towers with grid supply.
Continuous Operating Power (COP)
Continuous power output at 100% constant electrical load for unlimited hours. Applied in oil & gas base-load plants and heavy industrial operations.
Generator Fleet & Fuel Consumption Specifications
Values are typical for Cummins and Perkins engines operating under UAE ambient conditions (PF 0.8, 400/230V, 50 Hz, 3-Phase).
| Model (kVA / kW) | Engine Model | Burn @ 50% Load | Burn @ 75% Load | Burn @ 100% Load | Noise (dBA @ 7m) | Action |
|---|---|---|---|---|---|---|
| 50 kVA / 40 kW | Perkins 1103A-33TG1 | 7.1 L/hr | 10.5 L/hr | 14.1 L/hr | 65 dBA | View Model → |
| 100 kVA / 80 kW | Cummins 6BT5.9G2 | 12.5 L/hr | 18.2 L/hr | 24.0 L/hr | 68 dBA | View Model → |
| 250 kVA / 200 kW | Cummins 6LTAA8.9G2 | 29.0 L/hr | 42.0 L/hr | 57.0 L/hr | 72 dBA | View Model → |
| 500 kVA / 400 kW | Cummins QSX15-G8 | 54.0 L/hr | 78.5 L/hr | 106.0 L/hr | 75 dBA | View Model → |
| 1000 kVA / 800 kW | Cummins KTA38-G5 | 108.0 L/hr | 161.0 L/hr | 215.0 L/hr | 79 dBA | View Model → |
| 1250 kVA / 1000 kW | Cummins KTA50-G3 | 135.0 L/hr | 198.0 L/hr | 265.0 L/hr | 80 dBA | View Model → |
Our Seamless 6-Step Engineering Deployment Process
From initial site survey to live chiller, generator, and portacabin commissioning across the UAE.
1. Site Load & Cooling Audit
Our engineers evaluate kVA electrical demand, chiller tonnage (TR), ductwork, or portacabin footprint requirements.
2. Fast Quotation & Scheduling
Transparent rental or purchase quotation with equipment specs, mobilization plan, and delivery timeline within 60 minutes.
3. Crane Transport & Rigging
Dispatch via low-bed trailers and hiab crane trucks with certified ground rigging and placement on site.
4. Cabling, Piping & Ducting
Installation of power cables, ATS panels, insulated chilled-water hoses, pumps, and wild air distribution ducts.
5. Commissioning & Load Testing
Full-load verification of voltage, frequency, chilled-water delta-T, and cabin utilities before handover.
6. Maintenance & Technical Support
Preventive servicing, rapid spare replacement, and dedicated technician support across all Emirates.
Critical Sectors Served by Hire Equipments
Engineered power, temporary cooling, and site cabin packages built for major UAE industries.
Construction & Infrastructure
Wild air cooling, rental generators, concrete curing chillers, and site portacabins.
Events & Exhibitions
Super-silent gensets, tent AC units, temporary cooling, and VIP modular cabins.
Oil & Gas / Industrial
Heavy-duty prime generators, process cooling chillers, and insulated site offices.
Healthcare & Data Centers
Redundant emergency chillers, standby generators, and precision server room AC.
Retail & Hospitality
Chiller plant bypass during maintenance, commercial rental ACs, and backup power.
Strategic Regional Depots Delivering Rapid UAE Coverage
Strategically positioned equipment yards ensuring low transport costs and rapid emergency response times.
Dubai
Al Quoz & JAFZA Logistics Hub
Abu Dhabi
Mussafah Industrial & ICAD Depot
Sharjah
SAIF Zone & Industrial 10 Depot
Ajman
AFZA & Industrial Area Depot
Ras Al Khaimah
Al Ghail & Al Hamra Hub
Fujairah
Port of Fujairah & Marine Hub
Umm Al Quwain
Old Town & Industrial Depot
Oman Cross-Border
Sohar & Muscat Corridor Dispatch
Latest Engineering & Equipment Guides
Frequently Asked Questions — Hire Equipments UAE
Everything you need to know about rental chillers, temporary cooling, wild air, generators, and portacabins.
Need Rental Chillers, Cooling, Generators, or Portacabins in UAE Today?
Connect with Hire Equipments for competitive rental rates, refurbished chillers, used & purchased generators, or custom portacabins deployed fast across Dubai, Abu Dhabi, Sharjah, and all Emirates.